Cost-benefit analysis

Cost-benefit analysis adds up everything a project costs and everything it returns, in money, over the same period. It answers the question: are the benefits worth more than the costs?

Also called: benefit-cost analysis.

Benefit to cost ratio = present value of benefits ÷ present value of costs

  • Present value: a future amount expressed in the money of today, using a discount rate
  • Ratio above 1: the benefits are worth more than the costs
  • Net benefit: benefits minus costs
  • Return on investment: net benefit ÷ costs

When to use it

  • You are weighing an investment such as a new system, a machine, a hire or a new line of business.
  • You have several projects and funds for only some of them.
  • You want to present a clear case to partners, a bank or a board.

How to do it

  1. Define the project and the period

    State what you would do, and what happens if you do nothing. Choose a period that fits the life of the project, often three to five years.

  2. List the costs

    Include one-off costs such as purchase, setup and training, and running costs such as licenses and maintenance. Add a contingency for overruns.

  3. List the benefits

    Put a money value on each benefit: costs saved, new revenue, costs avoided. Note the benefits you cannot value beside the numbers, and leave them out of the sums.

  4. Place each amount in its year

    Benefits often start small and build up. A cost paid today weighs more than a benefit received in year five.

  5. Discount and compare

    Convert every year to present value with a discount rate, then compare the totals. Read the net benefit, the ratio and the return on investment together.

  6. Test a cautious case

    Lower the benefits and raise the costs. If the project still pays, the case is strong.

Example: a stock management system

A small distributor considers a system that costs 40,000 to install and 6,000 a year to run. It expects savings of 20,000 a year for five years. The discount rate is 10%.

MeasureOver 5 yearsAt present value
Benefits100,00075,816
Costs70,00062,745
Net benefit30,00013,071
Benefit to cost ratio1.431.21

The benefits exceed the costs on both views. At present value, each 1 spent returns 1.21 and the project adds 13,071. The return on investment over five years is 43% (30,000 ÷ 70,000). The gap between the two columns shows why timing matters: the costs come early and the savings come later. These are round numbers for illustration; your result depends on your own estimates.

Common mistakes

  • Counting the same benefit twice, for example hours saved and the cost of those hours. Fix: value each effect once.
  • Leaving out running costs and the time of your own team. Fix: list every cost the project causes.
  • Assuming full benefits from the first day. Fix: build them up over the first years.
  • Comparing totals without discounting. Fix: use present values when the period is longer than a year or two.

The French engineer Jules Dupuit set out the idea in 1848, and the United States Flood Control Act of 1936 required that the benefits of federal projects exceed their costs.